Essays in Production, Project Planning and Scheduling : (Registro nro. 290362)
[ vista simple ]
000 -CABECERA | |
---|---|
campo de control de longitud fija | 04890nam a22003975i 4500 |
001 - NÚMERO DE CONTROL | |
campo de control | 290362 |
003 - IDENTIFICADOR DEL NÚMERO DE CONTROL | |
campo de control | MX-SnUAN |
005 - FECHA Y HORA DE LA ÚLTIMA TRANSACCIÓN | |
campo de control | 20160429154744.0 |
007 - CAMPO FIJO DE DESCRIPCIÓN FÍSICA--INFORMACIÓN GENERAL | |
campo de control de longitud fija | cr nn 008mamaa |
008 - DATOS DE LONGITUD FIJA--INFORMACIÓN GENERAL | |
campo de control de longitud fija | 150903s2014 xxu| o |||| 0|eng d |
020 ## - NÚMERO INTERNACIONAL ESTÁNDAR DEL LIBRO | |
Número Internacional Estándar del Libro | 9781461490562 |
-- | 9781461490562 |
024 7# - IDENTIFICADOR DE OTROS ESTÁNDARES | |
Número estándar o código | 10.1007/9781461490562 |
Fuente del número o código | doi |
035 ## - NÚMERO DE CONTROL DEL SISTEMA | |
Número de control de sistema | vtls000342659 |
039 #9 - NIVEL DE CONTROL BIBLIOGRÁFICO Y DETALLES DE CODIFICACIÓN [OBSOLETO] | |
Nivel de reglas en descripción bibliográfica | 201509030856 |
Nivel de esfuerzo utilizado para asignar no-encabezamientos de materia en puntos de acceso | VLOAD |
Nivel de esfuerzo utilizado en la asignación de encabezamientos de materia | 201405050247 |
Nivel de esfuerzo utilizado para asignar clasificación | VLOAD |
-- | 201402061132 |
-- | staff |
040 ## - FUENTE DE LA CATALOGACIÓN | |
Centro catalogador/agencia de origen | MX-SnUAN |
Lengua de catalogación | spa |
Centro/agencia transcriptor | MX-SnUAN |
Normas de descripción | rda |
050 #4 - CLASIFICACIÓN DE LA BIBLIOTECA DEL CONGRESO | |
Número de clasificación | HD30.23 |
100 1# - ENTRADA PRINCIPAL--NOMBRE DE PERSONA | |
Nombre de persona | Pulat, P. Simin. |
Término indicativo de función/relación | editor. |
9 (RLIN) | 321047 |
245 10 - MENCIÓN DE TÍTULO | |
Título | Essays in Production, Project Planning and Scheduling : |
Resto del título | A Festschrift in Honor of Salah Elmaghraby / |
Mención de responsabilidad, etc. | edited by P. Simin Pulat, Subhash C. Sarin, Reha Uzsoy. |
264 #1 - PRODUCCIÓN, PUBLICACIÓN, DISTRIBUCIÓN, FABRICACIÓN Y COPYRIGHT | |
Producción, publicación, distribución, fabricación y copyright | Boston, MA : |
Nombre del de productor, editor, distribuidor, fabricante | Springer US : |
-- | Imprint: Springer, |
Fecha de producción, publicación, distribución, fabricación o copyright | 2014. |
300 ## - DESCRIPCIÓN FÍSICA | |
Extensión | xiv, 414 páginas 102 ilustraciones, 30 ilustraciones en color. |
Otras características físicas | recurso en línea. |
336 ## - TIPO DE CONTENIDO | |
Término de tipo de contenido | texto |
Código de tipo de contenido | txt |
Fuente | rdacontent |
337 ## - TIPO DE MEDIO | |
Nombre/término del tipo de medio | computadora |
Código del tipo de medio | c |
Fuente | rdamedia |
338 ## - TIPO DE SOPORTE | |
Nombre/término del tipo de soporte | recurso en línea |
Código del tipo de soporte | cr |
Fuente | rdacarrier |
347 ## - CARACTERÍSTICAS DEL ARCHIVO DIGITAL | |
Tipo de archivo | archivo de texto |
Formato de codificación | |
Fuente | rda |
490 0# - MENCIÓN DE SERIE | |
Mención de serie | International Series in Operations Research & Management Science, |
Número Internacional Normalizado para Publicaciones Seriadas | 0884-8289 ; |
Designación de volumen o secuencia | 200 |
500 ## - NOTA GENERAL | |
Nota general | Springer eBooks |
505 0# - NOTA DE CONTENIDO CON FORMATO | |
Nota de contenido con formato | Ubiquitous OR in Production Systems -- Integrated Production Planning and Pricing Decisions in Congestion-Prone Capacitated Production Systems -- Refined EM Method for Solving Linearly Constrained Global Optimization Problems -- The Price of Anarchy for a Network of Queues in Heavy Traffic -- A Comparative Study of Procedures for the Multinomial Selection Problem -- Vulnerability Discussion in Multimodal Freight Systems -- Scheduling and Financial Planning in Stochastic Activity Networks -- A Risk Integrated Methodology for Project Planning Under Uncertainty -- Dynamic Resource Constrained Multi-Project Scheduling Problem with Weighted Earliness/Tardiness Costs -- Multi-Mode Resource Constrained Project Scheduling Problem Including Multi-Skill Labor (MRCPSP-MS): Model and a Solution Method -- Hybrid Flow Shop Scheduling with Availability Constraints -- A Probabilistic Characterization of Allocation Performance in a Worker-Constrained Job Shop -- Mine Planning Above and Below Ground: Generating a Set of Pareto-Optimal Schedules Considering Risk and Return -- Multiple-Lot Lot Streaming in a Two-stage Assembly System. |
520 ## - SUMARIO, ETC. | |
Sumario, etc. | From the Preface: This festschrift is devoted to recognize the career of a man who not only witnessed the growth of operations research from its inception, but also contributed significantly to this growth. Dr. Salah E. Elmaghraby received his doctorate degree from Cornell University in 1958, and since then, his scholarly contributions have enriched the fields of production planning and scheduling and project scheduling. This collection of papers is contributed in his honor by his students, colleagues, and acquaintances. It offers a tribute to the inspiration received from his work, and from his guidance and advice over the years, and recognizes the legacy of his many contributions. Dr. Elmaghraby is a pioneer in the area of project scheduling (in particular, project planning and control through network models, for which he coined the term ‘activity networks’.) In his initial work in this area, he developed an algebra based on signal flow graphs and semi-Markov processes for analyzing generalized activity networks involving activities with probabilistic durations. This work led to the development of what was later known as the Graphical Evaluation and Review Technique (GERT), and GERT simulation models. He has made fundamental contributions in determining criticality indices for activities, in developing methodologies for project compression and time/cost analysis, and in the use of stochastic and chance-constrained programming and Petri Nets for the analysis of activity networks. This volume brings together fourteen contributions, which can be viewed under the following three main themes: operations research and its application in production planning; project scheduling, and production scheduling, inspired by, and in many cases based on, Dr. Elmaghraby’s work in these areas. The first five chapters are devoted to the first theme, followed by four chapters each devoted to the other two, respectively. An additional chapter is devoted to the vulnerability of multimodal freight systems. |
590 ## - NOTA LOCAL (RLIN) | |
Nota local | Para consulta fuera de la UANL se requiere clave de acceso remoto. |
700 1# - PUNTO DE ACCESO ADICIONAL--NOMBRE DE PERSONA | |
Nombre de persona | Sarin, Subhash C. |
Término indicativo de función/relación | editor. |
9 (RLIN) | 304720 |
700 1# - PUNTO DE ACCESO ADICIONAL--NOMBRE DE PERSONA | |
Nombre de persona | Uzsoy, Reha. |
Término indicativo de función/relación | editor. |
9 (RLIN) | 313795 |
710 2# - PUNTO DE ACCESO ADICIONAL--NOMBRE DE ENTIDAD CORPORATIVA | |
Nombre de entidad corporativa o nombre de jurisdicción como elemento de entrada | SpringerLink (Servicio en línea) |
9 (RLIN) | 299170 |
776 08 - ENTRADA/ENLACE A UN FORMATO FÍSICO ADICIONAL | |
Información de relación/Frase instructiva de referencia | Edición impresa: |
Número Internacional Estándar del Libro | 9781461490555 |
856 40 - LOCALIZACIÓN Y ACCESO ELECTRÓNICOS | |
Identificador Uniforme del Recurso | <a href="http://remoto.dgb.uanl.mx/login?url=http://dx.doi.org/10.1007/978-1-4614-9056-2">http://remoto.dgb.uanl.mx/login?url=http://dx.doi.org/10.1007/978-1-4614-9056-2</a> |
Nota pública | Conectar a Springer E-Books (Para consulta externa se requiere previa autentificación en Biblioteca Digital UANL) |
942 ## - ELEMENTOS DE PUNTO DE ACCESO ADICIONAL (KOHA) | |
Tipo de ítem Koha | Recurso en línea |
No hay ítems disponibles.