000 02916nam a22003855i 4500
001 303563
003 MX-SnUAN
005 20160429155827.0
007 cr nn 008mamaa
008 150903s2012 gw | o |||| 0|eng d
020 _a9783642256141
_99783642256141
024 7 _a10.1007/9783642256141
_2doi
035 _avtls000358311
039 9 _a201509031014
_bVLOAD
_c201405070229
_dVLOAD
_y201402191518
_zstaff
040 _aMX-SnUAN
_bspa
_cMX-SnUAN
_erda
100 1 _aMatanovic, Davorin.
_eautor
_9342172
245 1 0 _aSand Control in Well Construction and Operation /
_cby Davorin Matanovic, Marin Cikes, Bojan Moslavac.
264 1 _aBerlin, Heidelberg :
_bSpringer Berlin Heidelberg,
_c2012.
300 _avii, 200 páginas 97 ilustraciones, 78 ilustraciones en color.
_brecurso en línea.
336 _atexto
_btxt
_2rdacontent
337 _acomputadora
_bc
_2rdamedia
338 _arecurso en línea
_bcr
_2rdacarrier
347 _aarchivo de texto
_bPDF
_2rda
490 0 _aSpringer Environmental Science and Engineering
500 _aSpringer eBooks
505 0 _aReasons for sand production and prediction possibilities -- Obtaining relevant formation data and samples -- Sand control techniques -- Treatment fluid selection -- Gravel – pack design -- Screen design -- Chemical consolidation design -- Frack packing -- Perforating for sand control -- Surface equipment (pumping, mixing, filtering) -- Down hole equipment -- Sand control method selection.
520 _aProduced sand causes a lot of problems. From that reasons sand production must be monitored and kept within acceptable limits. Sand control problems in wells result from improper completion techniques or changes in reservoir properties. The idea is to provide support to the formation to prevent movement under stresses resulting from fluid flow from reservoir to well bore. That means that sand control often result with reduced well production. Control of sand production is achieved by: reducing drag forces (the cheapest and most effective method), mechanical sand bridging (screens, gravel packs) and increasing of formation strength (chemical consolidation). For open hole completions or with un-cemented slotted liners/screens sand failure will occur and must be predicted. Main problem is plugging. To combat well failures due to plugging and sand breakthrough Water-Packing or Shunt-Packing are used.
590 _aPara consulta fuera de la UANL se requiere clave de acceso remoto.
700 1 _aCikes, Marin.
_eautor
_9342173
700 1 _aMoslavac, Bojan.
_eautor
_9342174
710 2 _aSpringerLink (Servicio en línea)
_9299170
776 0 8 _iEdición impresa:
_z9783642256134
856 4 0 _uhttp://remoto.dgb.uanl.mx/login?url=http://dx.doi.org/10.1007/978-3-642-25614-1
_zConectar a Springer E-Books (Para consulta externa se requiere previa autentificación en Biblioteca Digital UANL)
942 _c14
999 _c303563
_d303563